Well now. The sun may be shining, but there are clouds overhead, and poor old Drew has gone back to the drawing (drew-ing?) board.
So, having knit furiously up to the armholes and completed the back and started on one of the fronts, I took stock. Hmmm. Less than three balls of yarn used for a project that is supposed to take 9 balls. Hmm. And, only 21cm below the armhole for something meant to fit a 4-5 yr old, even before washing/shrinking. Hmmmmm.
It wasn't stacking up. I checked on Ravelry, and I think there's only one completed Drew (perhaps that says something), which had the comment that it came up small. A forum post about the pattern and yarn requirement mismatch generated various comments mostly saying 'dont forget the hood' - which is a bit bamboozling as this pattern doesn't have a hood, but anyway. I usually find Rowan patterns/sizing to be generous, so thought age 4-5 would be fine for my average/slim 4 1/2 year old son. Then I got the tape measure - you know like proper knitters do - and actually measured my son and a couple of his jackets, and have decided to start all over again. This time I am going to use the age 6-7 size in terms of chest size/width, but aim for something which is about the same length as the age 10-11 size. I hope I'll end up with a jacket which he can wear for a little while at least, and not something which is so short he'll grow out of it before I have had chance to sew the zipper in.
I spend an unhappy half an hour or so on Wednesday morning frogging all the lovely stripes, and then I took a deep breath and started again. I went to an interesting lecture later on that day, and got on with the reknitting while Carolyn Steel talked about cities and food and her book 'Hungry City'. Food for thought. If you are interested at all in issues around food shopping and supermarkets and growing your own (which of course most people are) then it's worth having a look and/or listening to Carolyn speak. She is very passionate about her subject, and there is lots of interesting info on her website and blog.
Showing posts with label Drew. Show all posts
Showing posts with label Drew. Show all posts
Friday, 10 June 2011
Monday, 30 May 2011
Smitten
The boys went out on Saturday to watch the rugby sevens at Murrayfield. While they were out I grabbed a little pile of Rowan Denim which has been marinading in the stash for a while. I swatched for Drew - something new to knit for the bean. I got gauge and cast on, and I'm smitten. I can't put it down, even though there are a million other things to do like finish Grace, plant out the runner beans, hoover up the dust bunnies, make the supper, write a presentation for Wednesday. You know how it is. I can't stop. It's only been on the needles since Saturday afternoon and I'm almost at the armholes. It's yummy. I love the feel of the fabric in my hands.
My stash of Rowan Denim doesnt quite run to the required 9 balls of one colour/dye lot, so I'm going all stripey instead. The bean declared yesterday that he "...doesnt like stripes..." but he added that when it's finished, then he might like them then. I'm smitten, even if he isnt (yet). And, as he is only 4, I like to think I'll be able to make him wear it anyway.
Betty is looking pretty good too, but she's one for a quiet corner when there is space and time and light to concentrate on the pattern and the increases (that's a lower cuff in case you're wondering).
The wild weather has kept us mostly inside this weekend. The wind has been incredible and both children have been blown over by it, making outside walks/adventures rather difficult. The sun has been glorious, but the showers frequent and heavy and the wind very, very strong. I managed a few minutes of gardening between the showers, earthing up the spuds and weeding the denuded rows of salad and beetroot. Pesky slugs.
Subscribe to:
Posts (Atom)